Now on the App Store

Build force you can measure.

ISOBEAST is a precision isometric training log for ISO-BAR equipment. Track force, hold duration, and hook position natively.

Everything isometric training needs.

Built from the ground up specifically for Isometric Barbell equipment (ISO-BAR / ISOMAX / ISOCHAIN).

🦾

Precision Logging

Log force, hold duration, and exact hook slot (1–36) in under three taps. Pre-filled inputs from your last session so you never start from scratch.

Speed
📈

Deterministic Progression

No black-box AI. ISOBEAST scores every set (Success, Neutral, Failure) using a transparent performance ratio and updates targets automatically.

Science
📖

Built-in ISO-BAR Programs

Load training templates straight from the ISO-BAR manual: The Promethean, 6×6, Military Power, Iron Man, and One-Rep Max Testing.

Templates
🏆

PR Vault

Track all-time bests per exercise, hold mode, and hook slot independently. Every slot is a unique progression track.

Records
⚡

Automated Rest Timers

Rest timers start automatically after every set with haptic confirmation. Background notifications fire even when the app is minimised.

Recovery
📊

Volume & Trend Charts

Interactive force curves, session history, and a movement-balance radar chart per muscle pattern. Watch your strength curve rise over weeks.

Analytics
⌚

Apple Watch Companion

Log force, hold duration, and hook slot straight from your wrist. Sets and rest timers sync instantly to your phone over WatchConnectivity.

Watch
❤️

Apple Health Export

Completed strength workouts save straight to Apple Health, so your isometric training shows up alongside everything else and counts toward your Activity rings.

Export

Train from your wrist.

Log a set without touching your phone. Force, hold duration, and rest timers stay in sync. Finished workouts export straight to Apple Health.

Apple Health

Every screen purpose-built.

High-contrast dark UI designed for the gym floor.

Home screen with today's session
Active workout set logging
Force trend progress chart
PR Vault personal records

We don't sell your data.

ISOBEAST was built for athletes, not advertisers. Your training logs stay yours.

No ad SDKs No tracking Encrypted sync Secure keychain storage
Read the full privacy policy →

Train the tension.

Unlock true isometric strength with precise targets, transparent progression, and zero guesswork.